kisvasut.hu - narrowgauge.hu -

Gemenc operates again

2007.09.25 (Barabás Tibor)



Traffic has started in Gemenc after the flood of the Danube on 22.09.2007. Fortunately track is not seriously damaged.
Lassi mh a 2002-es árvíz idején

Lassi mh a 2002-es árvíz idején
Fotó: Barabás Tibor (2002.08.23.)

Trains has run only between Pörböly and Lassi, but they plan to operate on the full line on 27.09.2007. The maximal speed limit has been 10 km/h yet and steam engine is out of operation. Trains dont stop at Malomtelelő because the station has been under water yet.

Legutóbbi módosítás:

(c) Kisvasutak Baráti Köre Egyesület - Impresszum - Hír küldés - Üzenet
Belépés - Webmail - Intranet - FAV - EgyesületOnline